Dear,
4.1. Currently, we are using paper specified in the attached annex, please state in your proposal, if any adjustments of the paper roll parameters according to CUSS printer requirements would be needed.
4.2. We expect that after successful testing in testing environment, the rollout (uninstalling the old and installing the new WKS) would be done always at night hours, e.g. half of or one check-in island (12-24 counters) per night. If more time would be needed or different process will be necessary, we will have to agree on some different time schedule with the airport operation. But in general, installation works will be done during nights.
4.3. Yes, there should be always one LAN socket available at each position
4.4. Please follow instructions in PD, XVII.2. The basic criterion of the evaluation is the economic advantageousness of the tender. The Contracting Authority will evaluate the economic advantageousness of tenders based on the lowest tender price. With regards to technical and functional specifications, these should be ideally all met (minimal technical conditions must be met).
Regards
|